Geico2012

Client
Geico

COMPLETE CAR CHASSIS PRETREATMENT AND PAINTING PLANT

Working decks (3,000 tonns) for the whole pretreatment and painting plant. Engineering and calculation reports, assemblies and construction nodes, TEKLA modeling of all the structures.

Year: 2012
Workload: 6000

Client
Geico

COMPLETE CAR CHASSIS PRETREATMENT AND PAINTING PLANT

3D piping routing, supports and equipment modeling by PDMS. Piping detail engineering, Isometric drawings, piping layouts, material lists. Engineering and studies for ovens, including internal and external ducts with supports. Engineering and calculation reports, assemblies and construction nodes, TEKLA modeling of all structures.

Year: 2014
Workload: 10000

Client
Falcare

COMPLETE CAR CHASSIS PRETREATMENT AND PAINTING PLANT

PDMS piping, supports and equpments modeling by PDMS. Providing detail piping engineering, Isometrics drawing, piping layout , lists.

Year: 2013
Workload: 3500

Falcare2013