
1 August 2019
–

Client
ITT
STEAM REFORMER PLANT
3D modelling of steam reformer plant for burner piping lines.
Year: 2019
Workload: 1000
Client
Turboden
ELECTRIC PRODUCTION PLANT THROUGH GEOTHERMIC
Detail engineering of piping construction and 80% lines stress analysis.
Year: 2018
Workload: 6000
Client
Macchi
BOILER
Design of a combined cycle boiler. Detail engineering of structures and piping through the 3D model.
Year: 2015
Workload: 3500


Client
Sebigas
BIOGAS PLANT
Designing of 14 plants for biogas production through a process of anaerobic digestion with materials from agro-industrial complex. Detail Engineering for structures and piping.
Year: 2012
Workload: 6000