
1 August 2019
–

DESIGN OF THE PIPELINE ON VERTICAL LATHE
Complete engineering of the layout and supports for the lubrication, cooling, air and hydraulic pipelines of the tool carrier of the vertical lathe AC46.
Workload: 3000
DESIGN OF THE PIPELINE ON VERTICAL LATHE
Complete engineering of the layout and supports for the lubrication, cooling, air and hydraulic pipelines of the tool carrier of the vertical lathe.
Workload: 500