PILOT PLANT

Realization of a pilot skid for the treatment of industrial waste through a high pressure membrane with automatic cleaning system.

The software can be controlled through an HMI panel positioned in front of the switchboard.

Year: 2021

Client
TENOVA Spa

4 COATER

Creation of 4 coater preparation Skids on behalf of Tenova Spa.

ABEL took care of the construction: from the choice and purchase of materials, the mechanical construction and electro-instrumental dressing, all the workshop tests, up to the packaging and shipping of the skids.

It also produced the certifications and technical passports for the export of goods to Russia.

Year: 2021

Client
DANIELI Spa

27 SKIDS

Construction of n° 27 skids for water, air, oxygen, nitrogen and argon circuits, developing the following activities:

  • Procurement of materials for frames and piping
  • Construction of frames and piping on board the skid
  • Handling of all items supplied by Danieli on subcontracting basis
  • Full painting of the skids
  • Covering and wiring of electrical instruments
  • Final packaging
  • Management of material certification interfacing with Danieli management software

Year: 2019

Client
DANIELI Spa

27 SKIDS

Construction of n° 27 skids for water, air, oxygen, nitrogen and argon circuits, developing the following activities:

  • Procurement of materials for frames and piping
  • Construction of frames and piping on board the skid
  • Handling of all items supplied by Danieli on subcontracting basis
  • Full painting of the skids
  • Covering and wiring of electrical instruments
  • Final packaging
  • Management of material certification interfacing with Danieli management software

Year: 2018

Macchi2017-2

Client
MACCHI

BFW / FUEL GAS SKID

Complete E.P.C. project for 10 boiler feed water/fuel gas skids, with EXW delivery term.

Year: 2017

Macchi2017-1

Client
MACCHI

COOLING WATER SKID

Complete E.P.C. project for 3 cooling water skids, with EXW delivery term.

Year: 2017

SWS2016

Client
SWS

CONDENSATE POLISHING SKID

Complete E.P.C. project for 7 condensate polishing skids, with DAT delivery term.

Year: 2016/2017