
CHEMICAL PRODUCTS PRODUCTION PLANT
Detailed engineering for the revamping of a new area of a chemical plant and extension of the truck loading section, bringing it from two docks to three.
Workload: 2700


SULFURIC ACID PRODUCTION PLANT
3D modeling of both piping and structures. Processing detail documentation for the construction, including carpentry, isometric piping, piping layouts, supports, elaboration in detail for jacketed lines.
Workload: 10000
CLORO SODA PRODUCTION PLANT
Multidisciplinary detail engineering.
Workload: 10000
REVAMPING OF AN EXISTING PHARMACEUTICAL PLANT
Inspection on site, bases and stairwells demolition and reconstruction, mezzanines restoration, new pipe rack, “as built” drawings. Calculations and designs complete with all structures and civil works.
Workload: 6000

SULPHURIC ACIDIC PLANT – 1500 TON/YEAR
Multidisciplinary detail engineering.
Workload: 18000
PRELIMINARY STUDY
Preliminary study and base engineering of distributions lines to realize a pharmaceutical plant. 3D modeling with PDMS and 2D distribution lay outs.
Workload: 1000


PHARMACEUTICAL PLANT FOR THE PRODUCTION OF ACTIVE SUBSTANCES
Field surveys and office engineering for the distribution of piping lines needed for the plant installation. Supports and materials list.
Workload: 4000